top of page

SW®

Our Featured Projects

SkyTrac Control System​

This system was built for AvocadoAndy and Whitecap Ski Resorts in May of 2018. It features two control panels, a dashboard, and two stop gates.

Skyline Quad

Using Whitecap Ski Resorts models, this was the first SW system constructed. This system featured two Garaventa CTEC panels with a dashboard controller. Constructed in April 2018.

Mount Snow North Face Project

This project was the most in detail project that has been taken on by SW so far. Months of planning was necessary in order to begin work on this project. Construction involved making two chairlifts from scratch. Both of them were Yan lifts built in the 80's. One of the lifts was then later retrofitted with CTEC line equipment and carriers. This lift remained with Yan terminals and drive. This project is still incomplete due to the large amount of work needed.

Yan Setup
Yan Fancy Terminal
CTEC SW Grip
CTEC Carrier
CTEC Carrier
Yan Hubcap Sheaves

Partnerships

SW is proud to be partners with the following groups

  • Whitecap Ski Resorts

  • Avocado Lifts & Alpine Installations

  • Scout Ski Lifts

  • Peak Ridge Ski Resort

  • FrostTech

Stay In Touch

SW Lift Technologies

Join our discord: SW Lift Technologies

Entry code:K3XrAsG

​

EMail: altavillasam@gmail.com

​

Web: https://swlifttechnologies.wixsite.com/swlt

contact

© 2018 by SW Lift Technologies, LLC

bottom of page